MSN EMAIL +86-373-3020456
Phone:+86-373-3020456
Mobil:86 15560181018
Fax:+86-0373-7720077
Msn:transfercar@msn.com
Email: sale@transfer-cart.com
Assembly Instructions of gantry crane
Add Time£º[2014-09-09 16:46:47]   Hits£º711    Print  Close

    Assembly Instructions of gantry crane

    1.With the column lying flat, assemble the casters to the base tube using the smaller diameter bolts, lock washers, and nuts in the supplied hardware box.Insert the bolts from the inside of the tube out and then into the caster mounting plate.Add the lock washer and nut . Without lubricant, the experienced mechanic should tighten these bolts to 55 to 60- foot-pounds torque each. If assembling a telescoping model, refer to Page 4.
    2.Lay the I beam on the floor with holes facing toward top of column assemblies.

    3.Assembly Instructions of gantry crane:Two people will raise one end of the column assembly base tube vertically until one end of the base is pointing up. One person should guide and steady the base and another person should guide and steady the top of the column as it is carefully positioned against the matching bolt holes in one end of the I beam. 

    4.Align the bolt holes in the mounting plates at the top of the column and on the I beam. Insert the larger diameter supplied bolts into the holes, add a lock washer and nut, and finger tighten only. Without lubrication, tighten these four bolts to 55 to 60- foot-pounds torque each. The base must be held steady while all bolts are tightened.

    This is all of the assembly Instructions of gantry crane.

    Related products:

    Heavy load double girder gantry crane

    Related mews:

    factor to check crane

 

 

Keyword:Assembly Instructions of gantry crane
Introduction | Enterprise culture | Leadership speech | Honors | Human resources | Events | Advice | Common Problem