How to finish the track laying work of the track metallurgy industry ladle transfer wagon?
Add Time£º[2018-03-12 11:54:17]   Hits£º138    Print  Close

 There are many different types of metallurgy industry ladle transfer wagon products in the market, so users can choose one of the most suitable products according to their own needs.One of them is an metallurgy industry ladle transfer wagon, which needs to be finished in accordance with requirements before normal operation.Otherwise, it may affect its normal transportation.

 
So, in the course of laying the tracks, do you know what the main issues are?Believe that there are a number of user friends who are concerned about this issue, the following to understand the specific content!First of all, prior to the construction of the track, it is necessary to design and select the use materials of the site laying environment and track.On the one hand, it is necessary to take into account the calculation requirements of the precision.
 
In a word, prepare these preparations before they are laid, so as not to have unexpected problems when they are actually laid.Second, when laying metallurgy industry ladle transfer wagon track, must consider its intensity.Remember, you can.t use heavy items at will, or you may cause orbital deformations.
 
It is important to remind everyone that when choosing the foundation, the best choice is relatively flat and firm ground, which should avoid the humid environment, so as not to rust the track of metallurgy industry ladle transfer wagon.At the same time, must pay attention to the selection of qualified parts and ensure that the welding is in place.
 
When finished, donnot forget to finish the test first to test the installation quality.Normally, we need to add a load of 90% of the maximum load to the metallurgy industry ladle transfer wagon to detect whether deformation or shift occurs during its operation. If there is any abnormity, it should be repaired immediately.
Keyword:track metallurgy industry ladle transfer wagon